We have two buildings under construction. On the first building, we are almost finished the office and the laundry room. The third room, the food storage room is still quite stark.
The second floor awaits construction. The second area under construction is our 6 bedroom addition. It also includes a small office for Ron, and extension on our bedroom, two bathrooms and a sitting room.
We’ve reached a point where small investors can help us complete a room at a time. A large investment will do wonders.
The following two pages will outline what projects need to be done first.
The asterisks *** point out our most urgent needs. The amounts are estimates.
BUILDING ONE
**Office of the Social Worker
$200 including undercoating for the walls and ceiling, paint, door handle
$50 to install internet 
**Bathroom of the Social Worker (very small)
$600 to include floor and wall tiles, toilet and sink, pipes,
wiring and light, undercoating and paint, door and frame
**Laundry room
$700 for cable and installation, industrial dryer ducts, undercoating and paint for the walls, two windows and a door
Food Storage Room
(for housing fridges, freezer, shelves, and large sacks of dry goods.)
$1200 including stucco for the walls, undercoating, paint, one window, one door, wiring and lights, floor tiles.
The Second Floor
(will include two bedrooms, a bathroom and a meeting room/games room.
Approximately $30,000-$35000 including pillars, roof, flooring, walls, windows, doors, bathroom fixtures, wiring, plumbing…
BUILDING TWO - The Big Addition
Thanks to those who donated for the big addition. We are now only missing the ceiling, some counter tops and the outside prep and painting.
We need to put the final roofing on, but that is also missing on the rest of the construction of the property.
OUTSIDE
$500 for the handrails on the ramp
$2000 to finish the paving stones